Parks and recreation

From trailheads to playgrounds and campgrounds, we build spaces where life happens outdoors

deer creek campground

  • Client: Utah DFCM

    Location: Heber, UT

    Overview: Construction of 32 new RV campsites equipped with water and electrical hookups. Scope included all clear and grub, grading, asphalt paving, prefabricated shelters, campfire rings, picnic tables and new public restroom with showers.

washington lake campground

  • Client: Bureau of Reclamation

    Location: Summit County, UT

    Overview: Construction of new campground, restrooms and utilities in a very remote region of the Uinta mountain range. Construction took place over three building seasons due to the high altitude, deep snow and short building seasons. Scope included tree removal, asphalt paving, utility hookups, campsites with fire rings & picnic tables.

green river campground

  • Client: Utah DFCM

    Location: Green River, UT

    Overview: Construction of new campground with 13 RV campsites and 1 large group site all equipped with full utilities at each site. Scope included all clear and grub, site excavation & grading, utilities, electrical and construction of new restroom building with 6 restrooms & showers.

jordanelle campground

  • Client: State of Utah

    Location: Heber, UT

    Overview: Construction of new campground on the banks of the Jordanelle reservoir. Scope included grading, clear and grub, asphalt paving, camp sites, pavilions, trails, restrooms, planting & irrigation.

dimple dell trailhead - wrangler

  • Client: Salt Lake County

    Location: Sandy, UT

    Overview: Construction of new improved trailhead that included site grubbing, excavation & grading, site concrete with new prefabricated shelters & picnic tables, new restroom building, site landscaping & Irrigation.

dimple dell trailhead - badger cove

9line community orchard
  • Client: Salt Lake County

    Location: Sandy, UT

    Overview: Construction of entire new trailhead, including site excavation & grading, new rock retaining wall, asphalt parking lot, new restroom with utilities, two picnic spots with prefabricated shelters and picnic tables.

9line community orchard

Seven canyons
  • Client: Salt Lake City

    Location: Salt Lake City

    Overview: What was an existing plot of neglected land was turned into a community orchard along the popular 9Line trail. Scope included clear and grubbing, grading, irrigations, seeding, planting and new compacted crushed gravel stone pathway.

liberty park seven canyons refuge

  • Client: Salt Lake City

    Location: Salt Lake City

    Overview: Construction of a revamped space in the existing 7 canyons area of Liberty Park. CWC partnered with ArcSitio Design, artist Stephen Goldsmith and SLC to consult on making this project happen within their budget and to perform the work. Scope included site clearing and grubbing, new irrigation and landscape enhancements, installation of artist tiles throughout, new light fixtures, installation of “people perches" and “Shishi-Odoshi’s” throughout, and construction of concrete spiral wall feature.

Cottonwood heights rec. center pool

  • Client: Cottonwood Heights City

    Location: Cottonwood Heights, UT

    Overview: Construction of an addition to the Cottonwood Heights Rec. Center. Work included a child’s zero entry pool with water features and play structures.

jordan river parkway improvements

  • Client: Salt Lake County Parks & Rec.

    Location: Salt Lake City, UT

    Overview: Construction of new precast tunnel done without interrupting traveling public using the trail.

parley’s creek trail

  • Client: UDOT

    Location: Salt Lake City, UT

    Overview: Construction of pedestrian walking trail through Parley’s Nature Preserve near Parley’s Canyon, UT. Scope included several retaining walls along the slope of the canyon and walking pathways.

orem city parks

  • Client: Orem City

    Location: Orem, UT

    Overview: Construction of four separate parks located throughout the city. Work included cast-in-place concrete skate park, landscaping, curvilinear steel trellises, fountains, restrooms, pavilions and group camp sites.

cottonwood heights rec center pool

  • Client: City of Tempe

    Location: Tempe, AZ

    Overview: Construction of a new water playground for children that features water cannons, spouting whales, spitting critters and cast-in-place concrete water source table. Also includes a “rain drip plaza”, which is a shade canopy built of stainless steel complete with thunder and rain simulating a desert lightning storm. Project also included artificial rock wall with built-in slides and water falls.

gualdalupe park

  • Client: Salt Lake City

    Location: Salt Lake City

    Overview: Construction of new park including site grading & landscaping, new playground, basketball court & picnic tables

Previous
Previous

Public Spaces & Infrastructure

Next
Next

Renovations & Remodels